At the student commons we are doing a lot of waterproofing, installing windows, cleaning up the trusses and installing the final parts of the mechanical system. Also we have finished the insulation and started the drywall. The framers have almost completed the wood soffit around the underside of the eaves of the building. The electricians are preparing to have PG&E "hot up" our transformer next week. The earthwork contractor is back and has started to clean up the front of the site in preparation for getting all of the concrete done in front of the building.
Fine Arts
At the fine arts we are continuing with the siding and window installation. We should finish up the windows next week and the siding should continue as well and finish up at the ceramics building. The mechaincal room floor has been finished so we can set all of our equipment and we have prepared the floors to run the radiant tubing at both buildings next week.