At the student commons the past two weeks we have continued to install the windows and have finished the majority of the sheetrock and taping of the walls. We have graded the front of the building and have started forming up the exterior flatwork and stairs. Our tile subcontracter has prepped the floor in the kitchen and will tile it next week. The stucco is being prepped and will continue next week. Also we have set the main trees out front of the building. The main standing seam metal roof was delivered and has started to be installed.
Fine Arts
Work at the fine arts is moving along. The past couple of weeks have seen the bathrooms tiled and all of the exterior door frames have been installed and the doors will be installed next week. The siding had some kinks to work out which have now been resolved and is continuing. The canopy framing is in and the steel was erected today. The interior topping slabs have been poured in the ceramics and digital media rooms. Both buildings radiant systems are now installed. Most of the interior millwork and cabinets have been delivered and are being installed. The ceilings will start next week. All of the windows are now installed and sealed. Most of the interior door frames are onsite and installed. The rest will be installed next week.