Monday, July 20, 2009

Week of 7/13

Student Commons

At the student commons last week we finished forming, reinforcing, pouring and sawcutting the topping slabs. The white blanket ontop of the floor is a curing blanket. Also we have started the exterior trim around all of the windows. The bollards were placed in front of the gas meter so that we can have PG&E turn on our gas this week. The site out in front of the student commons is currently a stockpile area for the offhaul from the Quad but will begin again this week when we do some staking for the curbs along the front of the building. This week also we will be continuing with the interior and exterior wood trim and will be starting on the walls and servery box.







Fine Arts Buildings


At the fine arts we have finished the yellow color coats of exterior paint and are finishing up the white trim. All of the underground drainage is in place and backfilled. All of the concrete walkways are formed and ready to be poured. At the interior of the buildings we are working on wall panels and finishing up some minor details. This week we will be finishing up the wall panels and also installing the toilet paritions and toilet accessories in the bathrooms. Once the wall panels are done we will be finishing up the tectum ceilings.







Tallant Science Center
At the science center we have had a busy week. We finished up all of our MEP rough-in and were signed off by the town. Also we finsished up most of the window installations, ceiling framing, and seismic work. The walls were insulated and we are prepared to start sheetrock on 7/20. This week we will be sheetrocking, finishing minor pickup framing, and installing the final windows. Also we will be waterproofing the first floor at ground level in preparation for concrete and stucco.


Quad and Richardson
Last week we demolished the entire quad and imported dirt to get it back to grade. This coming week we are installing all of the underground utilities that are required. At Richardson we formed, reinforced and poured the footings and stem wall. This week we will be framing up the new wall.